About > fee structure

Ian Smyth architect

B. Arch.Sc, Dip. Arch. RIAI.

qualifications

Member of the Royal Institute
of Architects of Ireland. 2005

Bachelor of Architectural
Science, Trinity College
Dublin. 1996

Diploma of Architecture,
Dublin Institute of
Technology. 1996

A large prior literature has investigated how government regulations, policies, and actions relate to entrepreneurship (see Blackburn and Schaper (2016), for a summary). Within this literature, many studies have investigated the role of taxes and start-up costs (Gentry and Hubbard 2000; Djankov et al. 2002; Klapper et al. 2006; Cullen and Gordon 2007; Braunerhjelm and Eklund 2014; Block 2016). Both taxes and start-up costs can be directly influenced by government policy and are shown to have strong relationships with entrepreneurship rates. So far, no study has investigated the role of taxes and start-up costs with regard to innovative entrepreneurship.

Please Note: Fee estimates as a percentage of building cost

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.

Prepare Survey of existing site or building and do Schematic Design drawings showing plans, sections and main elevations of building. These are teasing out drawings which help to develop the design ideas. I normally do 2 to 3 alternatives at this stage with the preferred option being developed further. These are drawn at small scale say 1:100.